Campus Center at a Glance
- Features that encourage and foster informal gatherings for students, faculty, and staff, both inside and outside of the Campus Center, such as a balcony overlooking the main atrium, outdoor patios, interior ledges, and flexible "living room," which features ample types of seating and a fireplace.
- A flexible, divisible multipurpose space for social and academic activities, including student dances, faculty and guest lectures, meetings, and other large-scale community events, such as student recruitment, orientation, and reunion events.
- The Student Organization Space, a dedicated collaborative work space for student organizations, and home to the offices of the Student Involvement & Leadership staff.
- A dining pavilion featuring outdoor seating and enhanced kitchen and serving capabilities.
- The Barbara Walters Gallery for exhibitions of fine art.
- The Barbara Walters Reading Room, which includes a display of materials from the pioneering journalist's career and information kiosks to view the items available in the Barbara Walters archives.
- Sustainable features that include a green roof over a portion of the first floor, LED lighting, an efficient orientation of the building to manage solar heat gain while maximizing natural daylight, and a highly insulted exterior wall to minimize heat or cooling loss.